Tank inspection

For some time now each tank has to be equipped with an overflow prevention device. The tank must also be fitted with a green cap. After the first test the tanks must be reinspected from time to time.

The tank inspection conducted by CV Devroe include the following steps:

  • Check for the presence and good working order of the overfill prevention
  • Check on accessory equipment
  • Check of the leak detection system
  • Check of the outer wall
  • Check for the presence of water and sludge
  • Check via ultrasound seal test
  • Check by negative pressure test

After the inspection your tank is given a green cap and a certificate of conformity from the accredited technician.